380-kV-Westküstenleitung (West Coast Line), construction section 4: Husum – Klixbüll
The aim of the project is to build a 380 kV transmission line as part of the energy transition in Germany
380 kV extra-high voltage line Emden-Ost – Conneforde
Creation of an electrical connection between Emden-Ost and Conneforde
380-kV-Westküstenleitung (West Coast Line), construction section 3: Heide West – Husum Nord
Construction of a 380 kV transmission line as part of the Energy transition in Germany
Project management for the production and transport of an exchange boat landing
for the HelWin Alpha transformer platform.
Project board for the realization of optimization projects
Project board for the realization of optimization projects along the entire value chain, in the production of rolls of all kinds.